Course Code: 843

SWITCH - Implementing Cisco IP Switched Networks Certification Training Course (642-813)

Class Dates:
1/7/2019
12/10/2018
2/11/2019
Length:
5 Days
Cost:
$3295.00
Class Time:
Technology:
Network
Delivery:

Overview

  • Course Overview
  • Implementing Cisco IP Switched Networks (SWITCH 642-813) is a qualifying exam for the Cisco Certified Network Professional CCNP®, and Cisco Certified Design Professional CCDP® certifications. The SWITCH 642-813 exam will certify that the successful candidate has important knowledge and skills necessary to to plan, configure and verify the implementation of complex enterprise switching solutions using Ciscos Campus Enterprise Architecture. The SWITCH exam also covers secure integration of VLANs, WLANs, voice and video into campus networks.
  • Audience

Prerequisites

  • Implementing Cisco IP Switched Networks (SWITCH) is a five-day instructor-led course designed for network engineers with at least one year of professional work experience, who are ready to advance their skills and work independently on complex network solutions.

    Valid CCNA certification or any CCIE Certification can act as a prerequisite.

  • Recommended Courses:

Course Details

  • Implement VLAN based solution, given a network design and a set of requirements
  • Determine network resources needed for implementing a VLAN based solution on a network
  • Create a VLAN based implementation plan
  • Create a VLAN based verification plan
  • Configure switch-to-switch connectivity for the VLAN based solution
  • Configure Access Ports for the VLAN based solution
  • Verify the VLAN based solution was implemented properly using show and debug commands
  • Document results of VLAN implementation and verification
  • Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
  • Determine network resources needed for implementing a Security solution
  • Create a implementation plan for the Security solution
  • Create a verification plan for the Security solution
  • Configure port security features
  • Configure general switch security features
  • Configure private VLANs Configure VACL and PACL
  • Verify the Security based solution was implemented properly using show and debug commands
  • Document results of Security implementation and verification
  • Implement Switch based Layer 3 services, given a network design and a set of requirements
  • Determine network resources needed for implementing a Switch based Layer 3 solution
  • Create an implementation plan for the Switch based Layer 3 solution
  • Create a verification plan for the Switch based Layer 3 solution
  • Configure routing interfaces Configure Layer 3 Security
  • Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
  • Document results of Switch based Layer 3 implementation and verification
  • Prepare infrastructure to support advanced services
  • Implement a Wireless Extension of a Layer 2 solution
  • Implement a VoIP support solution
  • Implement video support solution
  • Implement High Availability, given a network design and a set of requirements
  • Determine network resources needed for implementing High Availability on a network
  • Create a High Availability implementation plan
  • Create a High Availability verification plan
  • Implement first hop redundancy protocols
  • Implement switch supervisor redundancy
  • Verify High Availability solution was implemented properly using show and debug commands
  • Document results of High Availability implementation and verification